MicroNet SP9121 Manual Pagina 22

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 184
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 21
2 Planning the Project TAC Xenta Server – Gateway, Technical Manual
22 (184) Schneider Electric Buildings AB, June 2011
04-00124-06-en
2.4 Understanding the Example System
We are going to create a system for a fictitious company, ACME Inc.,
which has one office bulding as illustrated in Fig. 2.2. The building is a
typical, small two-storey office building, served by packaged roof-top
equipment. The first floor area serves the Entrance Lobby, Accounts,
Marketing, and Senior Management. The second floor area serves Cus-
tomer Support and Engineering.
Fig. 2.2: The ACME building.
Engineering
Support
Lobby
Accounts
Conference Room
Marketing and Management
Vista de pagina 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 183 184

Comentarios a estos manuales

Sin comentarios